Crude Oil Storage Tank 8 Floor and Cathodic Protection System Design Review

This study reviewed preliminary design documents for the floor and CP system replacement as well as historical operating data for the VMT tank CP systems.

The study resulted in the development of a number of findings and recommendations. General findings and recommendations are discussed in the executive summary. Detailed discussions are provided in Section 3.

File Type: pdf
Categories: Terminal Operations
Tags: Tank inspections
Author: Taku Engineering, William Mott
Skip to content