This study reviewed preliminary design documents for the floor and CP system replacement as well as historical operating data for the VMT tank CP systems.
The study resulted in the development of a number of findings and recommendations. General findings and recommendations are discussed in the executive summary. Detailed discussions are provided in Section 3.