This report summarizes a review of the procedures and reports for inspections conducted on tanks 7 and 94 at the Valdez Marine Terminal.
Researchers at Taku Engineering reviewed the modifications completed on the tanks as well as the API 653 Out-of-Service inspection reports for each tank. The researchers’ findings and
recommendations are detailed in the report.
File Type:
pdf