VMT Crude Oil Tank 13 Inspection Review

This report summarizes the findings of the 196 page inspection report produced by APSC's API 653 inspector, and compares the inspector's findings to prior inspections in 1998 (out-of-service), 2004 (in-service, external only), and 2009 (in-service, external only). This report also examines whether the Cathodic Protection system installed under the new tank floor (installed in 1998) has remained operational and protective during the period of 1999 to 2014.

File Type: pdf
Categories: Terminal Operations
Tags: compendium, Tank inspections
Author: Harvey Consulting, Susan Harvey
Skip to content