Seismic Studies of the Valdez Marine Terminal

Because better seismic engineering is now available for asset protection and because the 1964 earthquake is now believed to have been more severe than originally thought, the council is concerned that the seismic protection of Valdez Marine Terminal (VMT) assets may not be adequate for an earthquake of the size that occurred in 1964. Specific … Read more

Dismantling, Removal, and Restoration Fund

The Trans-Alaska Pipeline System (TAPS) was constructed through the central portion of Alaska on right-of-way lands granted by federal, state, and private landowners. There is a Dismantling, Removal, and Restoration (DR&R) obligation originating in the pipeline right-of-way grant and lease agreements with the state and federal governments. PWSRCAC had concerns about the TAPS DR&R fund. … Read more

Pipeline Right-of-way Renewal

The Trans-Alaska Pipeline System (TAPS) was constructed through Alaska on right-of-way lands granted by federal, state, and private landowners. State and federal grants were renewed in 2002 and 2003, respectively, for the maximum 30 years. The Bureau of Land Management, which has system-wide oversight of TAPS renewal, had issued a draft environmental impact statement, on … Read more

Skip to content